- Construction Date:
- 4/6/2018 - 4/17/2018
- Location:
- Washington DC
- General Contractor:
- Gilbane Grunley
- Work Details:
Retro Environmental was contracted to conduct interior demolition of the building back to shell conditions for reconstruction. Retro also conducted asbestos abatement throughout the building prior to demolition.
- Category:
- Federal