DC Mormon Temple

Project Details

  • Construction Date:
  • 5/18/2018 - 8/18/2018
  • Location:
  • Silver Spring, MD
  • General Contractor:
  • Okland Construction
  • Work Details:
  • Retro Environmental was contracted for asbestos abatement, including removal of TSI, ACM firestop material, duct insulation, ACM seam sealer, ducting with ACM joint sealer, end ACM sealant on TSI ACM pin mastic, and ACM boiler breaching.

  • Category:
  • Commercial

Project Photos